Ivaco Rolling Mills Rolling Schedule
Millimeters/Decimal (Fractional Inches)

4.75 mm .1875 " 3/16

Apr 28 - 17E
Jun 2 - 22E
Jul 5 - 27E
Aug 2 - 31K

5.50 mm .216 " 7/32

May 7 - 19D
Jun 1 - 22D
Jun 11 - 24D
Jul 4 - 27D
Jul 15 - 29D
Aug 1 - 31J

6.00 mm .234 " 15/64

May 6 - 19C
May 30 - 22C
Jun 10 - 24C
Jul 3 - 27C
Jul 14 - 29C
Jul 31 - 31I

6.50 mm .256 " 1/4

May 5 - 19B
May 29 - 22B
Jun 9 - 24B
Jul 2 - 27B
Jul 13 - 29B
Jul 30 - 31H

7.00 mm .276 " 9/32

May 4 - 19A
May 28 - 22A
Jun 8 - 24A
Jul 1 - 27A
Jul 12 - 29A
Jul 29 - 31G

7.50 mm .297 " 19/64

Apr 27 - 17I
May 3 - 18T
May 27 - 21F
Jun 24 - 26E
Jul 29 - 31F

8.00 mm .315 " 5/16

May 3 - 16D
May 19 - 21E
Jun 22 - 26D
Jul 27 - 31E

8.30 mm .328 " 21/64

May 18 - 21D
Jul 26 - 31D

8.50 mm .335 " 11/32

May 3 - 16C
May 18 - 21C
Jun 21 - 26C
Jul 25 - 31C

9.00 mm .354 " 23/64

May 3 - 16B
May 17 - 21B
Jun 20 - 26B
Jul 25 - 31B

9.50 mm .374 " 3/8

May 16 - 21A
Jun 20 - 26A
Jul 24 - 31A

10.00 mm .394 " 25/64

May 15 - 20J
Jun 18 - 25J
Jul 23 - 30J

10.30 mm .406 " 13/32

May 13 - 20I
Jun 17 - 25I
Jul 22 - 30I

10.50 mm .414 " 13/32

May 13 - 20H
Jun 17 - 25H
Jul 21 - 30H

11.00 mm .433 " 7/16

May 12 - 20G
Jun 16 - 25G
Jul 21 - 30G

11.30 mm .445 " #10M

May 12 - 20R

11.50 mm .453 " 29/64

May 11 - 20F
Jun 16 - 25F
Jul 20 - 30F

12.00 mm .472 " 15/32

May 11 - 20E
Jun 15 - 25E
Jul 19 - 30E

12.50 mm .493 " 31/64

May 10 - 20D
Jun 14 - 25D
Jul 19 - 30D

13.00 mm .512 " 33/64

May 8 - 20C
Jun 13 - 25C
Jul 18 - 30C

13.50 mm .531 " 17/32

May 8 - 20B
Jun 12 - 25B
Jul 17 - 30B

14.30 mm .562 " 9/16

May 7 - 20A
Jun 11 - 25A
Jul 16 - 30A

14.70 mm .578 " 37/64

May 2 - 18J
Jun 8 - 23J
Jul 12 - 28J

15.00 mm .593 " 19/32

May 2 - 18I
Jun 7 - 23I
Jul 11 - 28I

15.90 mm .625 " 5/8

May 1 - 18H
Jun 7 - 23H
Jul 11 - 28H

16.10 mm .629 " #15M

May 3 - 18R

16.50 mm .650 " 21/32

Apr 29 - 18A
Jun 2 - 23A
Jul 6 - 28A

17.50 mm .689 " 11/16

May 1 - 18G
Jun 6 - 23G
Jul 10 - 28G

18.25 mm .718 " 23/32

May 1 - 18F
Jun 6 - 23F
Jul 10 - 28F

19.50 mm .768 " 49/64

Apr 29 - 18B
Jun 4 - 23C
Jul 6 - 28B

20.25 mm .797 " 51/64

Jun 3 - 23B

21.00 mm .828 " 53/64

Apr 30 - 18D
Jul 8 - 28D

21.50 mm .844 " 27/32

Apr 30 - 18E
Jul 9 - 28E

23.00 mm .906 " 29/32

Apr 30 - 18C
Jul 8 - 28C

23.80 mm .937 " 15/16

Jun 6 - 23E

24.2 mm .953 " 61/64

May 1 - 18S

25.5 mm 1.00 " 1/1

Jun 4 - 23D

Rolling dates are approximate and indicate the planned end of rolling.
Delivery could be up to two weeks after the actual rolling.
4.75 mm requires minimum of 750 tons to justify rolling.
All other diameters require minimum of 600 tons.

This page was last revised on 2017-04-28 00:01:01