IRM ROLLING SCHEDULE

Rolling Schedule

Rolling dates are approximate and indicate the planned end of rolling. Delivery could be up to two weeks after the actual rolling.

  • 4.75 mm requires minimum of 350 tons to justify rolling.
  • Rebar requires minimum of 600 tons to justify rolling
  • All other diameters require minimum of 280 tons.

4.75 mm .1875 " 3/16

Apr 1414E
May 918E
Jun 1522E
Jul 1026J

5.50 mm .216 " 7/32

Apr 414D
Apr 2115T
May 918D
Jun 1322D
Jun 2524C
Jul 926I

6.00 mm .234 " 15/64

Apr 314C
Apr 2115S
May 818C
Jun 1122C
Jun 2424B
Jul 826H

6.50 mm .256 " 1/4

Apr 314B
Apr 2015R
May 718B
Jun 1022B
Jun 2324A
Jul 826G

7.00 mm .276 " 9/32

May 718A
Jun 622A
Jul 726F

7.50 mm .297 " 19/64

May 617E
Jun 521F
Jul 626E

8.00 mm .315 " 5/16

May 517D
Jun 421E
Jul 526D

8.30 mm .328 " 21/64

Jun 321D

8.50 mm .335 " 11/32

May 517C
Jun 321C
Jul 426C

9.00 mm .354 " 23/64

May 517B
Jun 221B
Jul 426B

9.50 mm .374 " 3/8

Apr 2217A
Jun 121A
Jul 326A

10.00 mm .394 " 25/64

Apr 2216J
May 1520J
Jul 225J

10.30 mm .406 " 13/32

Apr 2216I
May 1520I
Jul 225I

10.50 mm .414 " 13/32

Apr 2216H
May 1520H
Jul 125H

11.00 mm .433 " 7/16

Apr 2216G
May 1520G
Jul 125G

11.30 mm .445 " #10M

May 617S

11.50 mm .453 " 29/64

Apr 2216F
May 1420F
Jun 3025F

12.00 mm .472 " 15/32

Apr 2216E
May 1420E
Jun 3025E

12.50 mm .493 " 31/64

Apr 2116C
May 1420C
Jun 2725C

13.00 mm .512 " 33/64

Apr 2216D
May 1420D
Jun 2925D

13.50 mm .531 " 17/32

Apr 2116B
May 1320B
Jun 2625B

14.30 mm .562 " 9/16

Apr 2116A
May 1320A
Jun 2525A

14.70 mm .578 " 37/64

May 1319M
Jun 2223H

15.00 mm .593 " 19/32

Apr 1715K
May 1319L
Jun 2023G

15.90 mm .625 " 5/8

Apr 1715J
May 1319K
Jun 1923F

16.10 mm .629 " #15M

May 617R

16.50 mm .650 " 21/32

Apr 1415A
May 919A
Jun 1623A

17.50 mm .689 " 11/16

Apr 1615I
May 1319J
Jun 1923E

18.25 mm .718 " 23/32

Apr 1615H
May 1219I
Jun 1823D

19.50 mm .768 " 49/64

Apr 1515B
May 1119C
Jun 1823C

20.25 mm .797 " 51/64

Apr 1515M
May 1119B
Jun 1723B

21.00 mm .828 " 53/64

Apr 1615F
May 1219H

21.50 mm .844 " 27/32

Apr 1615G
May 1219G

23.00 mm .906 " 29/32

Apr 1615E
May 1219F

23.80 mm .937 " 15/16

Apr 1515D
May 1219E

25.5 mm 1.00 " 1/1

Apr 1515C