IRM ROLLING SCHEDULE

Rolling Schedule

Rolling dates are approximate and indicate the planned end of rolling. Delivery could be up to two weeks after the actual rolling.

  • 4.75 mm requires minimum of 350 tons to justify rolling.
  • Rebar requires minimum of 600 tons to justify rolling
  • All other diameters require minimum of 280 tons.

4.75 mm .1875 " 3/16

Dec 1557E
Jan 1402E
Feb 1007E
Mar 812E

5.50 mm .216 " 7/32

Nov 2657D
Dec 1460C
Jan 1302D
Jan 2504C
Feb 1007D
Feb 1809C
Mar 712D
Mar 2014C

6.00 mm .234 " 15/64

Dec 1268B
Jan 902C
Jan 2304B
Feb 807C
Feb 1609B
Mar 512C
Mar 1914B

6.50 mm .256 " 1/4

Dec 1268A
Jan 802B
Jan 2304A
Feb 707B
Feb 1509A
Mar 512B
Mar 1814A

7.00 mm .276 " 9/32

Dec 260D
Jan 702A
Feb 707A
Mar 412A

7.50 mm .297 " 19/64

Nov 3065E
Jan 501F
Feb 506E
Mar 211F

8.00 mm .315 " 5/16

Nov 2965D
Jan 301E
Feb 406D
Mar 111E

8.30 mm .328 " 21/64

Dec 1901D
Feb 2711D

8.50 mm .335 " 11/32

Nov 2865C
Dec 1801C
Feb 206C
Feb 2711C

9.00 mm .354 " 23/64

Nov 2765B
Dec 1701B
Feb 106B
Feb 2611B

9.50 mm .374 " 3/8

Nov 2765A
Dec 1701A
Feb 106A
Feb 2511A

10.00 mm .394 " 25/64

Dec 1067J
Jan 3105J
Feb 2410J
Mar 2715J

10.30 mm .406 " 13/32

Dec 1067I
Jan 3005I
Feb 2310I
Mar 2615I

10.50 mm .414 " 13/32

Dec 967H
Jan 3005H
Feb 2310H
Mar 2615H

11.00 mm .433 " 7/16

Dec 967G
Jan 2905G
Feb 2210G
Mar 2615G

11.30 mm .445 " #10M

Dec 1658S
Jan 1903S
Feb 1408I
Mar 1713S

11.50 mm .453 " 29/64

Dec 867F
Jan 2805F
Feb 2210F
Mar 2515F

12.00 mm .472 " 15/32

Dec 867E
Jan 2805E
Feb 2110E
Mar 2515E

12.50 mm .493 " 31/64

Dec 667B
Jan 2605C
Feb 1910C
Mar 2215C

13.00 mm .512 " 33/64

Dec 767D
Jan 2705D
Feb 2010D
Mar 2315D

13.50 mm .531 " 17/32

Dec 667A
Jan 2605B
Feb 1910B
Mar 2215B

14.30 mm .562 " 9/16

Dec 567C
Jan 2505A
Feb 1810A
Mar 2115A

14.70 mm .578 " 37/64

Dec 566G
Jan 2203M
Feb 1408G
Mar 1613M

15.00 mm .593 " 19/32

Dec 466F
Jan 2203L
Feb 1308F
Mar 1613L

15.90 mm .625 " 5/8

Dec 466E
Jan 2103K
Feb 1308E
Mar 1613K

16.10 mm .629 " #15M

Dec 1658R
Jan 1903R
Feb 1408H
Mar 1713R

16.50 mm .650 " 21/32

Dec 366A
Jan 1503A
Feb 1108A
Mar 913A

17.50 mm .689 " 11/16

Dec 366D
Jan 2103J
Feb 1308D
Mar 1513J

18.25 mm .718 " 23/32

Dec 366C
Jan 2003I
Feb 1208C
Mar 1513I

19.50 mm .768 " 49/64

Jan 1503B
Feb 1208B
Mar 913B

20.25 mm .797 " 51/64

Dec 366B
Jan 1503C
Mar 1113C

21.00 mm .828 " 53/64

Jan 1903G
Mar 1413G

21.50 mm .844 " 27/32

Jan 2003H
Mar 1413H

23.00 mm .906 " 29/32

Jan 1803F
Mar 1313F

23.80 mm .937 " 15/16

Jan 1703E
Mar 1213E

25.5 mm 1.00 " 1/1

Jan 1603D
Mar 1113D