IRM ROLLING SCHEDULE

Rolling Schedule

Rolling dates are approximate and indicate the planned end of rolling. Delivery could be up to two weeks after the actual rolling.

  • 4.75 mm requires minimum of 350 tons to justify rolling.
  • Rebar requires minimum of 600 tons to justify rolling
  • All other diameters require minimum of 280 tons.

4.75 mm .1875 " 3/16

Sep 1046E
Sep 2251E
Oct 2556E
Nov 2761E

5.50 mm .216 " 7/32

Aug 1146D
Sep 949C
Sep 2151D
Oct 1254C
Oct 2456D
Nov 658C
Nov 2661D
Dec 1364C

6.00 mm .234 " 15/64

Sep 749B
Sep 2051C
Oct 1054B
Oct 2256C
Nov 458B
Nov 2461C
Dec 1164B

6.50 mm .256 " 1/4

Sep 749A
Sep 1951B
Oct 1054A
Oct 2256B
Nov 458A
Nov 2361B
Dec 1164A

7.00 mm .276 " 9/32

Aug 1147S
Sep 1851A
Oct 2156A
Nov 2361A

7.50 mm .297 " 19/64

Sep 1750F
Oct 1955E
Nov 2160E
Dec 2165F

8.00 mm .315 " 5/16

Sep 1550E
Oct 1855D
Nov 2060D
Dec 1965E

8.30 mm .328 " 21/64

Sep 1350D
Dec 1765D

8.50 mm .335 " 11/32

Sep 1350C
Oct 1555C
Nov 1760C
Dec 1765C

9.00 mm .354 " 23/64

Sep 1150B
Oct 1455B
Nov 1660B
Dec 1565B

9.50 mm .374 " 3/8

Sep 1150A
Oct 1455A
Nov 1560A
Dec 1465A

10.00 mm .394 " 25/64

Sep 648J
Oct 953J
Nov 1459J
Dec 1063J

10.30 mm .406 " 13/32

Sep 548I
Oct 753I
Nov 1359I
Dec 963I

10.50 mm .414 " 13/32

Sep 548H
Oct 653H
Nov 1359H
Dec 963H

11.00 mm .433 " 7/16

Sep 448G
Oct 553G
Nov 1259G
Dec 863G

11.30 mm .445 " #10M

Sep 2347I
Sep 2852I
Nov 357P
Dec 262I

11.50 mm .453 " 29/64

Sep 348F
Oct 453F
Nov 1159F
Dec 763F

12.00 mm .472 " 15/32

Sep 348E
Oct 353E
Nov 1159E
Dec 663E

12.50 mm .493 " 31/64

Aug 3148C
Oct 153C
Nov 859C
Dec 463C

13.00 mm .512 " 33/64

Sep 248D
Oct 253D
Nov 1059D
Dec 563D

13.50 mm .531 " 17/32

Aug 3048B
Sep 3053B
Nov 859B
Dec 363B

14.30 mm .562 " 9/16

Aug 3048A
Sep 2953A
Nov 759A
Dec 363A

14.70 mm .578 " 37/64

Aug 2947G
Sep 2752G
Nov 257M
Nov 3062G

15.00 mm .593 " 19/32

Aug 1247F
Sep 2652F
Nov 257L
Nov 3062F

15.90 mm .625 " 5/8

Aug 2947E
Sep 2652E
Nov 157K
Nov 3062E

16.10 mm .629 " #15M

Sep 2347H
Sep 2752H
Nov 357O
Dec 162H

16.50 mm .650 " 21/32

Aug 1247A
Sep 2452A
Oct 2657A
Nov 2862A

17.50 mm .689 " 11/16

Aug 2847D
Sep 2552D
Nov 157J
Nov 2962D

18.25 mm .718 " 23/32

Aug 2847C
Sep 2552C
Oct 3157I
Nov 2962C

19.50 mm .768 " 49/64

Aug 2847B
Sep 2552B
Oct 2657B
Nov 2862B

20.25 mm .797 " 51/64

Aug 2847M
Oct 2857C

21.00 mm .828 " 53/64

Aug 1347N
Oct 3157G

21.50 mm .844 " 27/32

Aug 1347L
Oct 3157H

23.00 mm .906 " 29/32

Aug 1347P
Oct 3057F

23.80 mm .937 " 15/16

Aug 1347R
Oct 2957E

25.5 mm 1.00 " 1/1

Oct 2957D