IRM ROLLING SCHEDULE

Rolling Schedule

Rolling dates are approximate and indicate the planned end of rolling. Delivery could be up to two weeks after the actual rolling.

  • 4.75 mm requires minimum of 350 tons to justify rolling.
  • Rebar requires minimum of 600 tons to justify rolling
  • All other diameters require minimum of 280 tons.

4.75 mm .1875 " 3/16

May 3027E
Jul 432E
Jul 2737E
Aug 3141E

5.50 mm .216 " 7/32

May 3027D
Jun 1329C
Jul 332D
Jul 2035C
Jul 2737D
Aug 3141D
Sep 1243C

6.00 mm .234 " 15/64

May 2725B
May 2827C
Jun 1129B
Jul 232C
Jul 1835B
Jul 2637C
Aug 2941C
Sep 1043B

6.50 mm .256 " 1/4

May 2525A
May 2727B
Jun 1029A
Jul 132B
Jul 1835A
Jul 2637B
Aug 2941B
Sep 1043A

7.00 mm .276 " 9/32

May 2427A
Jun 929D
Jun 3032A
Jul 2537A
Aug 2841A

7.50 mm .297 " 19/64

Jun 2831E
Jul 2536F
Aug 1240E

8.00 mm .315 " 5/16

Jun 2731D
Jul 2436E
Aug 1140D

8.30 mm .328 " 21/64

Jul 2336D

8.50 mm .335 " 11/32

Jun 2531C
Jul 2236C
Aug 940C

9.00 mm .354 " 23/64

Jun 2431B
Jul 2236B
Aug 840B

9.50 mm .374 " 3/8

Jun 2331A
Jul 2236A
Aug 740A

10.00 mm .394 " 25/64

May 1726N
Jun 2130J
Jul 1734J
Aug 639J
Sep 1944J

10.30 mm .406 " 13/32

Jun 2030I
Jul 1634I
Aug 539I
Sep 1844I

10.50 mm .414 " 13/32

May 1926L
Jun 2030H
Jul 1534H
Aug 539H
Sep 1844H

11.00 mm .433 " 7/16

May 1926K
Jun 1930G
Jul 1534G
Aug 439G
Sep 1744G

11.30 mm .445 " #10M

Jun 928P
Jul 933K
Sep 942R

11.50 mm .453 " 29/64

May 1926J
Jun 1830F
Jul 1434F
Aug 339F
Sep 1744F

12.00 mm .472 " 15/32

May 1826M
Jun 1830E
Jul 1334E
Aug 339E
Sep 1644E

12.50 mm .493 " 31/64

May 1826H
Jun 1530C
Jul 1134C
Jul 3139C
Sep 1444C

13.00 mm .512 " 33/64

May 1826I
Jun 1730D
Jul 1234D
Aug 139D
Sep 1544D

13.50 mm .531 " 17/32

Jun 1430B
Jul 1034B
Jul 3039B
Sep 1344B

14.30 mm .562 " 9/16

May 1726G
Jun 1430A
Jul 934A
Jul 3039A
Sep 1344A

14.70 mm .578 " 37/64

Jun 828M
Jul 833G
Jul 3038G
Sep 842M

15.00 mm .593 " 19/32

Jun 828L
Jul 833F
Jul 2938F
Sep 842L

15.90 mm .625 " 5/8

Jun 728K
Jul 733E
Jul 2938E
Sep 742K

16.10 mm .629 " #15M

Jun 928N
Jul 833J
Sep 942P

16.50 mm .650 " 21/32

May 3128A
Jul 533A
Jul 2838A
Sep 242A

17.50 mm .689 " 11/16

Jun 728J
Jul 633D
Jul 2938D
Sep 742J

18.25 mm .718 " 23/32

Jun 628I
Jul 633C
Jul 2938C
Sep 742I

19.50 mm .768 " 49/64

Jun 128B
Jul 633B
Jul 2938B
Sep 242B

20.25 mm .797 " 51/64

Jun 228C
Sep 342C

21.00 mm .828 " 53/64

Jun 528G
Sep 642G

21.50 mm .844 " 27/32

Jun 628H
Sep 642H

23.00 mm .906 " 29/32

Jun 528F
Sep 542F

23.80 mm .937 " 15/16

Jun 428E
Sep 442E

25.5 mm 1.00 " 1/1

Jun 328D
Sep 442D