IRM ROLLING SCHEDULE

Rolling Schedule

Rolling dates are approximate and indicate the planned end of rolling. Delivery could be up to two weeks after the actual rolling.

  • 4.75 mm requires minimum of 350 tons to justify rolling.
  • Rebar requires minimum of 600 tons to justify rolling
  • All other diameters require minimum of 280 tons.

4.75 mm .1875 " 3/16

Mar 1110E
Apr 1014E

5.50 mm .216 " 7/32

Mar 1010D
Apr 1014D

6.00 mm .234 " 15/64

Mar 710C
Mar 2011X
Apr 814C

6.50 mm .256 " 1/4

Mar 610B
Apr 714B

7.00 mm .276 " 9/32

Mar 510A
Apr 314A

7.50 mm .297 " 19/64

Mar 409F
Apr 213E
May 617E

8.00 mm .315 " 5/16

Mar 309E
Apr 113D
May 517D

8.30 mm .328 " 21/64

Mar 309D
Mar 3113F

8.50 mm .335 " 11/32

Mar 209C
Mar 3113C
May 217C

9.00 mm .354 " 23/64

Feb 2909B
Mar 3013B
May 117B

9.50 mm .374 " 3/8

Feb 2809A
Mar 2813A
May 117A

10.00 mm .394 " 25/64

Feb 2808J
Mar 2712J
May 116J

10.30 mm .406 " 13/32

Feb 2608I
Mar 2712I
Apr 3016I

10.50 mm .414 " 13/32

Feb 2608H
Mar 2612H
Apr 3016H

11.00 mm .433 " 7/16

Feb 2608G
Mar 2612G
Apr 2916G

11.30 mm .445 " #10M

Mar 2011S

11.50 mm .453 " 29/64

Feb 2508F
Mar 2612F
Apr 2916F

12.00 mm .472 " 15/32

Feb 2508E
Mar 2512E
Apr 2916E

12.50 mm .493 " 31/64

Mar 2412C
Apr 2516C

13.00 mm .512 " 33/64

Mar 2512D
Apr 2816D

13.50 mm .531 " 17/32

Mar 2112B
Apr 2416B

14.30 mm .562 " 9/16

Mar 2112A
Apr 2416A

14.70 mm .578 " 37/64

Mar 1811H
Apr 2415L

15.00 mm .593 " 19/32

Mar 1711G
Apr 2315K

15.90 mm .625 " 5/8

Mar 1711F
Apr 1815J

16.10 mm .629 " #15M

Mar 1911R

16.50 mm .650 " 21/32

Mar 1211A
Apr 1115A

17.50 mm .689 " 11/16

Mar 1611E
Apr 1715I

18.25 mm .718 " 23/32

Feb 2808M
Mar 1411D
Apr 1715H

19.50 mm .768 " 49/64

Mar 1311C
Apr 1315B

20.25 mm .797 " 51/64

Feb 2808L
Mar 1311B

21.00 mm .828 " 53/64

Mar 1411J
Apr 1615F

21.50 mm .844 " 27/32

Apr 1715G

23.00 mm .906 " 29/32

Mar 1311K
Apr 1615E

23.80 mm .937 " 15/16

Mar 1311L
Apr 1515D

24.2 mm .953 " 61/64

Mar 1311I

25.5 mm 1.00 " 1/1

Apr 1415C