Rolling dates are approximate and indicate the planned end of rolling. Delivery could be up to two weeks after the actual rolling.

  • 4.75 mm requires minimum of 350 tons to justify rolling.
  • Rebar requires minimum of 600 tons to justify rolling
  • All other diameters require minimum of 280 tons.

4.75 mm .1875 " 3/16

Mar 111E
Apr 416E
May 321E

5.50 mm .216 " 7/32

Feb 1309C
Feb 2811D
Mar 1613C
Apr 316D
Apr 1919C
May 221D
May 1924C

6.00 mm .234 " 15/64

Feb 1209B
Feb 2611C
Mar 1413B
Mar 3116C
Apr 1619B
Apr 3021C
May 1624B

6.50 mm .256 " 1/4

Feb 1109A
Feb 2511B
Mar 1313A
Mar 3116B
Apr 1519A
Apr 2921B
May 1624A

7.00 mm .276 " 9/32

Feb 2411A
Mar 3016A
Apr 2821A
May 2726A

7.50 mm .297 " 19/64

Feb 306Z
Feb 1109D
Feb 2110E
Mar 2815E
Apr 2620F
May 2525E

8.00 mm .315 " 5/16

Feb 306Y
Feb 1910D
Mar 2715D
Apr 2520E
May 2425D

8.30 mm .328 " 21/64

Feb 1810F
Apr 2320D

8.50 mm .335 " 11/32

Feb 306X
Feb 1810C
Mar 2515C
Apr 2220C
May 2225C

9.00 mm .354 " 23/64

Feb 306W
Feb 1510B
Mar 2315B
Apr 2020B
May 2125B

9.50 mm .374 " 3/8

Feb 306V
Feb 1410A
Mar 2315A
Apr 1920A
May 2025A

10.00 mm .394 " 25/64

Feb 1008J
Mar 2214J
Apr 1418J
May 1523J

10.30 mm .406 " 13/32

Feb 306U
Feb 908I
Mar 2114I
Apr 1418I
May 1423I

10.50 mm .414 " 13/32

Feb 306T
Feb 908H
Mar 2014H
Apr 1318H
May 1323H

11.00 mm .433 " 7/16

Feb 808G
Mar 2014G
Apr 1218G
May 1323G

11.30 mm .445 " #10M

Feb 806S
Mar 111S
Mar 1212P
Apr 917I
May 922I

11.50 mm .453 " 29/64

Feb 708F
Mar 1914F
Apr 1218F
May 1223F

12.00 mm .472 " 15/32

Feb 708E
Mar 1914E
Apr 1118E
May 1223E

12.50 mm .493 " 31/64

Feb 608C
Mar 1814C
Apr 1018C
May 1023C

13.00 mm .512 " 33/64

Feb 608D
Mar 1814D
Apr 1118D
May 1123D

13.50 mm .531 " 17/32

Feb 508B
Mar 1714B
Apr 1018B
May 1023B

14.30 mm .562 " 9/16

Feb 408A
Mar 1714A
Apr 918A
May 923A

14.70 mm .578 " 37/64

Feb 207G
Mar 1112N
Apr 817G
May 822G

15.00 mm .593 " 19/32

Feb 207F
Mar 1112M
Apr 717F
May 722F

15.90 mm .625 " 5/8

Feb 207E
Mar 1112L
Apr 717E
May 722E

16.10 mm .629 " #15M

Feb 806R
Mar 111R
Mar 1212O
Apr 817H
May 822H

16.50 mm .650 " 21/32

Mar 312A
Apr 517A
May 522A

17.50 mm .689 " 11/16

Feb 107D
Mar 1012K
Apr 717D
May 622D

18.25 mm .718 " 23/32

Mar 1012J
Apr 617C
May 622C

19.50 mm .768 " 49/64

Feb 507B
Mar 312B
Apr 517B
May 522B

20.25 mm .797 " 51/64

Mar 512C

21.00 mm .828 " 53/64

Mar 912G

21.50 mm .844 " 27/32

Mar 912I

23.00 mm .906 " 29/32

Mar 812H

23.80 mm .937 " 15/16

Feb 307H
Mar 612E

25.5 mm 1.00 " 1/1

Mar 612D