IRM ROLLING SCHEDULE

Rolling Schedule

Rolling dates are approximate and indicate the planned end of rolling. Delivery could be up to two weeks after the actual rolling.

  • 4.75 mm requires minimum of 350 tons to justify rolling.
  • Rebar requires minimum of 600 tons to justify rolling
  • All other diameters require minimum of 280 tons.

4.75 mm .1875 " 3/16

May 2124E
Jul 229E
Aug 434E
Aug 2139E

5.50 mm .216 " 7/32

May 922C
May 2024D
Jun 926C
Jun 3029D
Jul 1932C
Aug 334D
Aug 1236C
Aug 2139D

6.00 mm .234 " 15/64

May 622B
May 1824C
Jun 526B
Jun 2429C
Jul 1532B
Jul 3034C
Aug 1036B
Aug 1939C

6.50 mm .256 " 1/4

May 522A
May 1624B
Jun 426A
Jun 2429B
Jul 1432A
Jul 2934B
Aug 1036A
Aug 1939B

7.00 mm .276 " 9/32

May 1524A
Jun 2329A
Jul 2834A
Aug 1839A

7.50 mm .297 " 19/64

May 421M
May 1423F
Jun 2228E
Jul 2633F
Aug 1838E

8.00 mm .315 " 5/16

May 1323E
Jun 1828D
Jul 2533E
Aug 1738D

8.30 mm .328 " 21/64

May 1223D
Jul 2233D

8.50 mm .335 " 11/32

May 1223C
Jun 1728C
Jul 2133C
Aug 1638C

9.00 mm .354 " 23/64

May 1123B
Jun 1628B
Jul 2033B
Aug 1638B

9.50 mm .374 " 3/8

May 1123A
Jun 1528A
Jul 2033A
Aug 1538A

10.00 mm .394 " 25/64

May 421J
Jun 1427J
Jul 1331J
Aug 1437J

10.30 mm .406 " 13/32

May 221I
Jun 1327I
Jul 1231I
Aug 1437I

10.50 mm .414 " 13/32

May 221H
Jun 1327H
Jul 1231H
Aug 1437H

11.00 mm .433 " 7/16

May 121G
Jun 1227G
Jul 1131G
Aug 1437G

11.50 mm .453 " 29/64

May 121F
Jun 1227F
Jul 1031F
Aug 1337F

12.00 mm .472 " 15/32

Apr 3021E
Jun 1127E
Jul 1031E
Aug 1337E

12.50 mm .493 " 31/64

Apr 2721C
Jun 1027C
Jul 831C
Aug 1237C

13.00 mm .512 " 33/64

Apr 2821D
May 223N
Jun 1127D
Jul 931D
Aug 1337D

13.50 mm .531 " 17/32

Apr 2721B
Jun 1027B
Jul 831B
Aug 1237B

14.30 mm .562 " 9/16

Apr 2621A
Jun 927A
Jul 731A
Aug 1237A

14.70 mm .578 " 37/64

Jun 325M
Jul 730G
Aug 935M

15.00 mm .593 " 19/32

May 120F
Jun 325L
Jul 630F
Aug 935L

15.90 mm .625 " 5/8

Jun 325K
Jul 630E
Aug 935K

16.50 mm .650 " 21/32

May 223M
May 2425A
Jul 330A
Aug 435A

17.50 mm .689 " 11/16

Jun 225J
Jul 530D
Aug 935J

18.25 mm .718 " 23/32

May 2425I
Jul 530C
Aug 935I

19.50 mm .768 " 49/64

May 2525B
Jul 430B
Aug 435B

20.25 mm .797 " 51/64

May 2625C
Aug 535C

21.00 mm .828 " 53/64

Jun 125G
Aug 835G

21.50 mm .844 " 27/32

Jun 125H
Aug 835H

23.00 mm .906 " 29/32

May 3125F
Aug 735F

23.80 mm .937 " 15/16

May 2825E
Aug 635E

25.5 mm 1.00 " 1/1

May 2725D
Aug 635D