IRM ROLLING SCHEDULE

Rolling Schedule

Rolling dates are approximate and indicate the planned end of rolling. Delivery could be up to two weeks after the actual rolling.

  • 4.75 mm requires minimum of 350 tons to justify rolling.
  • Rebar requires minimum of 600 tons to justify rolling
  • All other diameters require minimum of 280 tons.

4.75 mm .1875 " 3/16

Jan 2004J
Feb 1409E
Mar 2114E
Apr 1118K

5.50 mm .216 " 7/32

Jan 2004I
Jan 2706C
Feb 1309D
Mar 311C
Mar 2014D
Mar 2916C
Apr 1118J
Apr 1920C

6.00 mm .234 " 15/64

Jan 2504H
Jan 2606B
Feb 1109C
Mar 111B
Mar 1814C
Mar 2816B
Apr 918I
Apr 1720B

6.50 mm .256 " 1/4

Jan 1904G
Jan 2506A
Feb 1009B
Feb 2811A
Mar 1714B
Mar 2716A
Apr 918H
Apr 1620A

7.00 mm .276 " 9/32

Jan 1904F
Feb 909A
Mar 1614A
Apr 818G

7.50 mm .297 " 19/64

Jan 1704E
Feb 808F
Mar 1513E
Apr 718F

8.00 mm .315 " 5/16

Jan 1604D
Feb 608E
Mar 1313D
Apr 618E

8.30 mm .328 " 21/64

Feb 508D
Apr 518D

8.50 mm .335 " 11/32

Jan 1504C
Feb 508C
Mar 1213C
Apr 518C

9.00 mm .354 " 23/64

Jan 1404B
Feb 408B
Mar 1113B
Apr 418B

9.50 mm .374 " 3/8

Feb 308A
Mar 1113A
Apr 418A

10.00 mm .394 " 25/64

Feb 207J
Mar 1012J
Apr 317K

10.30 mm .406 " 13/32

Feb 107I
Mar 912I
Apr 217J

10.50 mm .414 " 13/32

Feb 107H
Mar 912H
Apr 217I

11.00 mm .433 " 7/16

Jan 3107G
Mar 812G
Apr 217H

11.30 mm .445 " #10M

Feb 107R

11.50 mm .453 " 29/64

Jan 3007F
Mar 712F
Apr 117G

12.00 mm .472 " 15/32

Jan 3007E
Mar 712E
Apr 117F

12.50 mm .493 " 31/64

Jan 2907C
Mar 512C
Mar 3117D

13.00 mm .512 " 33/64

Jan 2907D
Mar 612D
Mar 3117E

13.50 mm .531 " 17/32

Jan 2807B
Mar 412B
Mar 3017C

14.30 mm .562 " 9/16

Jan 2807A
Mar 412A
Mar 3017A

14.70 mm .578 " 37/64

Jan 2405J
Feb 2710L
Mar 2615L
Apr 1619L

15.00 mm .593 " 19/32

Jan 2405I
Feb 2610K
Mar 2615K
Apr 1519K

15.90 mm .625 " 5/8

Jan 2405H
Feb 2610J
Mar 2515J
Apr 1519J

16.10 mm .629 " #15M

Jan 2305R

16.50 mm .650 " 21/32

Jan 2105A
Feb 1510A
Mar 2215A
Apr 1219A

17.50 mm .689 " 11/16

Jan 2305G
Feb 2610I
Mar 2515I
Apr 1519I

18.25 mm .718 " 23/32

Jan 2305F
Feb 2510H
Mar 2515H
Apr 1419H

19.50 mm .768 " 49/64

Jan 2105B
Feb 1610C
Mar 2315B
Apr 1319C

20.25 mm .797 " 51/64

Jan 2105K
Feb 1510B
Apr 1319B

21.00 mm .828 " 53/64

Jan 2205L
Feb 2510G
Mar 2415G
Apr 1419G

21.50 mm .844 " 27/32

Jan 2205E
Mar 2415F
Apr 1419F

23.00 mm .906 " 29/32

Jan 2205D
Feb 2410F
Mar 2415E
Apr 1419E

23.80 mm .937 " 15/16

Jan 2205C
Feb 2410E
Mar 2315D
Apr 1319D

24.2 mm .953 " 61/64

Feb 2310M

25.5 mm 1.00 " 1/1

Jan 2201C
Feb 1610D
Mar 2315C