IRM ROLLING SCHEDULE

Rolling Schedule

Rolling dates are approximate and indicate the planned end of rolling. Delivery could be up to two weeks after the actual rolling.

  • 4.75 mm requires minimum of 350 tons to justify rolling.
  • Rebar requires minimum of 600 tons to justify rolling
  • All other diameters require minimum of 280 tons.

4.75 mm .1875 " 3/16

May 2424E
Jun 3029E
Jul 3134E
Aug 3139E
Sep 3044E

5.50 mm .216 " 7/32

Jun 826C
Jun 2929D
Jul 1732C
Jul 3034D
Aug 836C
Aug 3139D
Sep 1442C
Sep 2944D

6.00 mm .234 " 15/64

Jun 426B
Jun 2529C
Jul 1432B
Jul 2834C
Aug 736B
Aug 3039C
Sep 1242B
Sep 2544C

6.50 mm .256 " 1/4

Jun 226A
Jun 2429B
Jul 1332A
Jul 2734B
Aug 736A
Aug 2939B
Sep 1142A
Sep 2444B

7.00 mm .276 " 9/32

May 2324O
Jun 2329A
Jul 2634A
Aug 2939A
Sep 2344A

7.50 mm .297 " 19/64

Jun 2228E
Jul 2433F
Aug 2838E
Sep 2243F

8.00 mm .315 " 5/16

Jun 1828D
Jul 2333E
Aug 2738D
Sep 2143E

8.30 mm .328 " 21/64

Jul 2133D
Sep 1843D

8.50 mm .335 " 11/32

Jun 1728C
Jul 2033C
Aug 2638C
Sep 1743C

9.00 mm .354 " 23/64

Jun 1628B
Jul 1933B
Aug 2638B
Sep 1643B

9.50 mm .374 " 3/8

Jun 1528A
Jul 1933A
Aug 2638A
Sep 1543A

10.00 mm .394 " 25/64

Jun 125N
Jun 1427J
Jul 1231J
Aug 2537J
Sep 1041J

10.30 mm .406 " 13/32

Jun 1427I
Jul 1131I
Aug 2537I
Sep 941I

10.50 mm .414 " 13/32

Jun 1427H
Jul 1031H
Aug 2537H
Sep 941H

11.00 mm .433 " 7/16

Jun 125P
Jun 1327G
Jul 1031G
Aug 2437G
Sep 941G

11.50 mm .453 " 29/64

Jun 1227F
Jul 931F
Aug 1037F
Sep 841F

12.00 mm .472 " 15/32

Jun 1227E
Jul 931E
Aug 1037E
Sep 841E

12.50 mm .493 " 31/64

Jun 1127C
Jul 731C
Aug 937C
Sep 641C

13.00 mm .512 " 33/64

Jun 1227D
Jul 831D
Aug 937D
Sep 741D

13.50 mm .531 " 17/32

Jun 1127B
Jul 731B
Aug 937B
Sep 641B

14.30 mm .562 " 9/16

Jun 1027A
Jul 631A
Aug 937A
Sep 541A

14.70 mm .578 " 37/64

May 2525M
Jul 530G
Aug 735M
Sep 440G

15.00 mm .593 " 19/32

May 3125L
Jul 530F
Aug 635L
Sep 440F

15.50 mm .609 " 39/64

Jul 530M
Aug 635O
Sep 440M

15.90 mm .625 " 5/8

May 3125K
Jul 530E
Aug 635K
Sep 440E

16.50 mm .650 " 21/32

May 2525A
Jul 230A
Aug 135A
Sep 140A

17.50 mm .689 " 11/16

May 2725J
Jul 430D
Aug 635J
Sep 340D

18.25 mm .718 " 23/32

May 3125I
Jul 330C
Aug 635I
Sep 340C

19.50 mm .768 " 49/64

May 2525B
Jul 330B
Aug 235B
Sep 240B

20.25 mm .797 " 51/64

May 2525C
Aug 335C

21.00 mm .828 " 53/64

May 2725G
Aug 535G

21.50 mm .844 " 27/32

May 2725H
Aug 535H

23.00 mm .906 " 29/32

May 2725F
Aug 535F

23.80 mm .937 " 15/16

May 2625E
Aug 435E

25.5 mm 1.00 " 1/1

Aug 335D