IRM ROLLING SCHEDULE

Rolling Schedule

Rolling dates are approximate and indicate the planned end of rolling. Delivery could be up to two weeks after the actual rolling.

  • 4.75 mm requires minimum of 350 tons to justify rolling.
  • Rebar requires minimum of 600 tons to justify rolling
  • All other diameters require minimum of 280 tons.

4.75 mm .1875 " 3/16

Jul 1927D
Aug 932E

5.50 mm .216 " 7/32

Jun 2927C
Jul 129C
Jul 1830O
Aug 832D
Aug 2034C
Sep 636I

6.00 mm .234 " 15/64

Jun 3027B
Jun 3029B
Jul 1730N
Aug 632C
Aug 1934B
Sep 536H

6.50 mm .256 " 1/4

Jun 2927A
Jun 3029A
Jul 1630M
Aug 432B
Aug 1834A
Sep 436G

7.00 mm .276 " 9/32

Jun 2926F
Aug 332A
Sep 236F

7.50 mm .297 " 19/64

Jun 2726E
Jun 2829D
Aug 231F
Sep 136E

8.00 mm .315 " 5/16

Jun 2726D
Aug 131E
Aug 3136D

8.30 mm .328 " 21/64

Jul 3031D

8.50 mm .335 " 11/32

Jun 2726C
Jul 3031C
Aug 3036C

9.00 mm .354 " 23/64

Jun 2727M
Jul 2931B
Aug 2936B

9.50 mm .374 " 3/8

Jun 2627L
Jul 2831A
Aug 2836A

10.00 mm .394 " 25/64

Jun 2627K
Jul 2730J
Aug 2735J

10.30 mm .406 " 13/32

Jul 2530I
Aug 2635I

10.50 mm .414 " 13/32

Jul 2530H
Aug 2635H

11.00 mm .433 " 7/16

Jun 2527N
Jul 2430G
Aug 2535G

11.50 mm .453 " 29/64

Jul 2330F
Aug 2535F

12.00 mm .472 " 15/32

Jun 2527I
Jul 2330E
Aug 2435E

12.50 mm .493 " 31/64

Jun 2427E
Jul 2130C
Aug 2235D

13.00 mm .512 " 33/64

Jun 2527H
Jul 2230D
Aug 2335C

13.50 mm .531 " 17/32

Jun 2427U
Jul 2030B
Aug 2135B

14.30 mm .562 " 9/16

Jun 2427F
Jul 2030A
Aug 2035A

14.70 mm .578 " 37/64

Jun 2228L
Aug 1733M

15.00 mm .593 " 19/32

Jun 2228K
Aug 1733L

15.90 mm .625 " 5/8

Jun 2128J
Aug 1633K

16.10 mm .629 " #15M

Jun 2128R

16.50 mm .650 " 21/32

Aug 1033A

17.50 mm .689 " 11/16

Jun 2328I
Aug 1533J

18.25 mm .718 " 23/32

Aug 1533I

19.50 mm .768 " 49/64

Aug 1233C

20.25 mm .797 " 51/64

Aug 1133B

21.00 mm .828 " 53/64

Aug 1433G

21.50 mm .844 " 27/32

Aug 1433H

23.00 mm .906 " 29/32

Jun 2428E
Aug 1433F

23.80 mm .937 " 15/16

Aug 1333E

25.5 mm 1.00 " 1/1

Aug 1233D